← Back to search · General page
PT-0151 — full details
Unit: Unit 2 · Window: W-11D · Panel: P1 row 2 col 8
System: RCS Reactor Coolant System · Priority: High
High temperature alarm — sample point PT-0151.
Temperature above the high alarm setpoint. (Sample data.)
Setpoints
| Label | Value | Units | Direction | Deadband | Delay |
|---|---|---|---|---|---|
| High | 1000 | °F | Rising | 5 | 10 s |
Drawings
- [Primary] SMP-DWG-1007 — Sample drawing 7 (rev A, Logic) — Primary sample drawing.
Engineering fields
Input source: SMP-LOOP-747
Normal state: Normal · Alarm state: Alarm
Response reference: ARP-SMP-17
Notes: Sample point created by the seed command.
Status: Active
Change history
| When | Type | By | Reason | SAP notification | SAP design | Field changes |
|---|---|---|---|---|---|---|
| 2026-11-17 01:54 | Import | sample-data | Sample data seed. | — | — | — |