← Back to search · General page
PT-0049 — full details
Unit: Unit 1 · Window: W-11B · Panel: P3 row 8 col 2
System: RCS Reactor Coolant System · Priority: Medium
High radiation alarm — sample point PT-0049.
Radiation monitor above the alarm setpoint. (Sample data.)
Setpoints
| Label | Value | Units | Direction | Deadband | Delay |
|---|---|---|---|---|---|
| High | 212 | % | Rising | 5 | 10 s |
Drawings
- [Primary] SMP-DWG-1001 — Sample drawing 1 (rev A, Logic) — Primary sample drawing.
Engineering fields
Input source: SMP-LOOP-340
Normal state: Normal · Alarm state: Alarm
Response reference: ARP-SMP-09
Notes: Sample point created by the seed command.
Status: Active
Change history
| When | Type | By | Reason | SAP notification | SAP design | Field changes |
|---|---|---|---|---|---|---|
| 2026-11-17 01:54 | Import | sample-data | Sample data seed. | — | — | — |